Parking Garage floor Toronto Main exit ramp waterproof traffic topping Installation in Edison Center

This very busy parking deck at Yonge and Eglinton has over 400 parking spaces and all of them exit via this main ramp. Due to the high volume of traffic, the only time that this parking that could be done was on a long weekend. The exit ramp needed to be closed and security guards.

By: epoxyguys
In: Industrial
0
Read MoreRead More

Newmarket City Hall Mechanical penthouse

Three mechanical penthouse is on the roof of the new market City Hall needed to be coated over the weekend  to minimize disruption to office operations below job complete       

By: epoxyguys
In: Industrial
0
Read MoreRead More

Polyurethane cement Floor repairs

This is a federally inspected food manufacturing facility. After complete removal of the existing epoxy floor, this super heavy duty, quarter inch thick resin floor was installed with very aggressive anti-slip.       

By: epoxyguys
In: Food Grade, Industrial
0
Read MoreRead More

4200 sf warehouse floor in Ajax

We connected our medium sized planetary grinder to a  600 V plug provided by the customer.  We ground the soft concrete thoroughly to discover that a joint between 2 slabs had been moving . One side was 1″ higher & over the years of the 2 slabs compressing against each other ,the concrete was “soft” on the.

By: epoxyguys
In: Industrial
0
Read MoreRead More

Yonge and Eglinton parking deck P2- traffic coating and waterproofing system installation

The day we began the removal of the existing coating was quite cold. After removal we repaired cracking and we installed the membrane which is the first layer of the waterproofing traffic system. It was still too cold when we installed and instead of it taking 24 hours it took 48 hours before we could install.

By: epoxyguys
In: Industrial
0
Read MoreRead More